Line
Extension Charges
It is the policy of Cumberland Electric
Membership Corporation to provide
service to new consumers in a fair and
equitable manner. When there is
reasonable assurance of adequate revenue
to cover CEMC's investment, there will
be no charge for line extensions to
serve the load. The following guidelines
will be used to determine when there
will be a charge for a line extension.
PERMANENT RESIDENTIAL DWELLINGS
1. All single phase extensions to
permanent dwellings up to 350 feet from
an existing CEMC distribution facility
will be provided at no cost to the
applicant.
2. Those desiring line extensions of
more than 350 feet from a CEMC
distribution facility will be required
to pay an aid-to-construction charge of
$5.00 per power line foot for the excess
over 350 feet. This aid-to-construction
charge will be paid to CEMC prior to
construction.
3. Prior to beginning work on any line
extension, CEMC may require that the
permanent residential dwelling be ready
for occupancy. This will include an
approval of wiring from the Deputy State
Electrical Inspector, water under
pressure, and sanitary sewage facilities
among other requirements.
MOBILE HOMES LOCATED ON INDIVIDUAL
LOTS
All single phase extensions to mobile
homes located on individual lots up to
350 feet of primary distribution line
from an existing CEMC distribution
facility will be provided at no cost to
the applicant provided the following
requirements are met:
1. The owner of the mobile home owns the
lot on which it will be located or has
control of the lot.
2. The mobile home has water under
pressure attached to it, either from a
well or a public water system.
3. The mobile home is attached to a
sewage system, either septic tank or
publicly-owned system.
4. The electric service to the mobile
home is of a permanent nature; that is,
overhead service from the CEMC pole to
an approved underground circuit from the
pole to the mobile home.
Where the mobile home owner requires
electric service and cannot meet the
above requirements, service may be
extended at unrecoverable costs for the
entire length of the line extension.
Where the requirements are met, the
primary distribution line will be
extended at the cost of five dollars
($5.00) per power line foot for the
excess over 350 feet. This cost will be
paid to CEMC prior to construction.
TEMPORARY SERVICE FOR CONSTRUCTION
PURPOSES
Line extensions will not be made for
temporary services unless there is
reasonable assurance a permanent
structure will be built or
aid-to-construction may be required. In
that case those desiring line extensions
of more than 350 feet from an existing
CEMC distribution facility will be
required to pay an aid-to-construction
charge of $5.00 per power line foot for
the excess over 350 feet. This
aid-to-construction charge will be paid
to CEMC prior to construction.
Line extensions to barns, pumps, grain
bins, shops, permanent outdoor signs,
and other similar type services shall be
charged at full cost and payment made
prior to construction.
COMMERCIAL SERVICES (Over 50 kW)
Commercial services over 50 kW will be
extended on an individual basis and will
require the execution of a power
contract between the consumer and CEMC.
|
|
 |
|
|